Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Purveyor  Purveyor
Purveyor  Purveyor
  • Politics
    • Home
      • International Scene
      • About
  • Technology/Telecom
  • Agriculture
  • Education
    • Interview
  • Human/Social Dev
  • Contacts
    • Sports/Youth
  • Ondo Aircraft Crash: Human Remains Found As 32 Feared Dead

WhatsApp: +234 8145346680

Telegram: PurveyorTel

Twitter
Instagram
Facebook
YouTube

Address: RSQ/u3/Abuja Road, Rigasa by Layin Service, Kaduna

Email: purveyorngr@gmail.com

WhatsApp: +234 8145346680

Telegram: PurveyorTel

Twitter
Instagram
Facebook
YouTube

  • Politics
    • Home
      • International Scene
      • About
  • Technology/Telecom
  • Agriculture
  • Education
    • Interview
  • Human/Social Dev
  • Contacts
    • Sports/Youth
  • Ondo Aircraft Crash: Human Remains Found As 32 Feared Dead
Subscribe
Close

Search

Power

Nigeria’s electricity crisis to persist as FG shifts debt payment to 2027

By Admin
November 24, 2026 3 Min Read
0

•Poor teamwork, illiquidity, others undermine efficiency – Tegbe

•Power crisis requires structural overhaul – Iledare

Nigeria’s electricity crisis to persist as FG shifts debt payment to 2027
Joseph Tegbe, Power Minister

Nigeria’s electricity crisis is unlikely to be resolved in 2026, as the Federal Government has shifted the settlement of its N3.3 trillion debt to power generation companies to 2027, while major interventions in metering and transmission infrastructure are also expected to extend beyond this year.

The Minister of Power, Joseph Tegbe, disclosed this during an interview with Arise  News yesterday, adding that the government had paid N1.23 trillion of the debt, negotiated down from an initial N6 trillion, and was exploring options to clear the outstanding balance.

These include offsetting obligations against royalties and corporate income tax, as well as engaging the Nigerian National Petroleum Company Limited, NNPC, to reduce gas costs for power generation companies.

“We’re on track to finish paying the rest next year. Because we are looking at different ways to settle it,” Tegbe said.

On the proposed debt offsets, he said: “You can’t take money with one hand and give it with the other hand. So, let’s net it off.”

Tegbe attributed 80 per cent of the sector’s challenges to human and institutional factors, with technical issues accounting for the remaining 20 per cent.

“I said the problem in power sector is 20 per cent technical, 80 per cent human,” he said, identifying poor teamwork, lack of coordination among operators, liquidity constraints and governance issues as major obstacles to efficiency.

He also criticised past investment decisions, saying some projects were driven by  political considerations rather than proper planning.

“From a technical point of view, I will tell you the biggest issue: it is that we’ve been throwing money at wrong things,” he said.

The minister said his ministry was reviewing ongoing projects to prioritise investments capable of improving electricity access.

Tegbe recently projected that stable electricity supply could take another three to five years. He also announced plans for a $2 billion East-West Super Grid project to expand transmission capacity from about 4,000MW to 19,000MW.

The proposed network would link Funtua, Gwagwalada, Ikot Ekpene, Benin, Epe and Ilorin. Procurement is under way, with completion expected within two years, according to the minister.

Reacting, Professor Emeritus of Petroleum Economics, Wumi Iledare, called for a structural overhaul, warning that replacing individuals would not resolve the sector’s deep-rooted problems.

“Darkness arising from persistent electricity failures in Nigeria is not fundamentally a consequence of individual ineptitude; it is a manifestation of institutional failure,” he said.

Iledare argued that decentralisation could encourage competition, investment and subnational participation, but stressed that it must be backed by effective regulation, institutional capacity and accountability.

“Ultimately, Nigeria needs institutional reform, not merely a change of individuals. The real test of decentralisation must be measurable improvements in electricity availability, affordability, reliability and accessibility,” he said.

Industry data also showed that more than 3,000MW was available for distribution nationwide, underscoring the gap between available supply and consumers’ electricity needs.

COURTESY: vanguardngr.com

Author

Admin

Follow Me
Other Articles
Previous

N1.35trn Energy Bill: How Rising Costs Threaten Jobs In Nigeria’s Factories

Next

FG’s CNG Affordable-fuel Promise Under Scrutiny As Prices Rise Over 139%

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Kano Emirate Crisis: Allow Supreme Court To Decide, Stop Interfering — Gov Yusuf
  • FG’s CNG Affordable-fuel Promise Under Scrutiny As Prices Rise Over 139%
  • Nigeria’s electricity crisis to persist as FG shifts debt payment to 2027
  • N1.35trn Energy Bill: How Rising Costs Threaten Jobs In Nigeria’s Factories
  • Navy Personnel Uncovers Illegal Refinery Intercepts 35,000 Litres Of Stolen Crude  ​

Recent Comments

  1. JamesHen on German Companies Cut US Investment To Three-Year Low, Data Show
  2. MiguelJoype on Senator Buba Delivers Campaign Promises to Constituent
  3. MiguelJoype on Senator Buba Delivers Campaign Promises to Constituent
  4. MiguelJoype on Nigeria: Tax Reforms vs Power Sector Reforms
  5. MiguelJoype on German Companies Cut US Investment To Three-Year Low, Data Show

Archives

  • November 2026
  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025

Categories

  • Agencies
  • Agriculture
  • Anniversary
  • Appointments
  • Archives
  • Aviation/Transportation
  • Business
  • Casualty
  • Column
  • Community/Entertainment
  • condolence
  • Culture/Tourism
  • Diplomacy
  • Education
  • Entrepreneurship
  • Environment/Emergency
  • Finance/Economy
  • Health
  • Honour
  • Human/Social Dev
  • International Scene
  • Judiciary
  • Obituary
  • Oil/New Energy
  • Opinion
  • Politics
  • Power
  • Project
  • Property
  • Religious Affairs
  • Security/Crime
  • Special Report
  • Sports/Youth
  • Technology/Telecom
  • Tourism
  • Traditional Inst
  • Tribute
  • UN
  • Uncategorized
  • Union
  • Workshop

Address: RSQ/u3/Abuja Road, Rigasa by Layin Service, Kaduna

Email: purveyorngr@gmail.com

WhatsApp: +234 8145346680

Twitter
Instagram
Facebook
YouTube

Address: RSQ/u3/Abuja Road, Rigasa by Layin Service, Kaduna

Email: purveyorngr@gmail.com

  • About
  • Contacts
  • Ondo Aircraft Crash: Human Remains Found As 32 Feared Dead

Address: RSQ/u3/Abuja Road, Rigasa by Layin Service, Kaduna

Email: purveyorngr@gmail.com

WhatsApp: +234 8145346680

Telegram: PurveyorTel

Twitter
Instagram
Facebook
YouTube

Copyright 2026 — Purveyor . All rights reserved. Blogsy WordPress Theme
WhatsApp
HiHello , welcome to Purveyor
Can we help you?
Open Chat
Powered by Joinchat